Design of Challawa Bridge in Kano State - Nigeria
The reinforced concrete bridge consists of No. 8 spans each 14.86 m long for a total length of 118.88 m and a total width of 11.00 m.
Preliminary and final design (2012) for Triacta Nigeria Ltd - Nigeria.
Design of Zik Avenue bridge in Enugu Town - Enugu State - Nigeria
The reinforced concrete bridge is a duplication of the existing bridge. It consists of No. 4 spans of 13.00 m each, it has a total length of 52.00 m and a total width of 10.20 m.
Final design (2009) for the Arab Contractors - Nigeria.
Design of Jangero bridge along Jangero - Kuriya - Busuru road - Zamfara State - Nigeria
The reinforced concrete bridge consists of No. 16 spans for a total length of 250.40 m. The width is equal to 10.80 m.
Final design (2008) for Contractors Borini Prono Nigeria Ltd - Nigeria.
Design of Agadaba-Arogbo bridge over river Olowa - Ondo State - Nigeria
The bridge consists of No. 10 spans of 35.00 m in length each and a width equal to 11.00 m. Structure in reinforced concrete with beams in prestressed reinforced concrete.
Preliminary and final design (2008) for Contractors Piccolo Brunelli Nigeria Ltd - Nigeria.
Design of Lamingo bridge across spillway channel - Plateau State - Nigeria
The reinforced concrete bridge consists of No. 3 spans, it has a total length of 54.00 m and a total width of 18.00 m.
Final design (2008) for Contractors RCF NIGERIA LTD - Nigeria.
Design of Omege-Noyo bridge across Ebonyi river - Ebonyi State - Nigeria
The reinforced concrete bridge consists of No. 4 spans of 20.00 m each; it has a width of 11.00 m.
Final design (2008) for Contractors RCF NIGERIA LTD - Nigeria.
Bridge on the Niger river at Shintaku / Lokoja in Kogi State - Nigeria
The bridge, with two separate carriageways, is composed by 26 spans for a total length of 2179 m. The width is equal to 11.00 m for each carriageway.
The river Niger discharge at the bridge section is about 35000 m3/sec. The permanent river bed along bridge alignment is about 1300 m wide, and is surrounded by flooded areas of about 1 Km wide in Shintaku bank and 0.3 Km wide in the Lokoja bank, contributing to the hydraulic section of the river.
The structure shall be realized with 5 structural elements, connected by sliding prestressed "active joints", that allow the forces transmission; therefore a continuous structure for a total length of 2179 m is achieved.
The deck is composed by a continuous box-girder beam, in prestressed reinforced concrete, to be built through self-supporting successive cantilever blocks. The structure is supported by piers fixed with the continuous beam, realized by pairs of flexible septa, in order to absorbe the concrete creep, shrinkage and thermal deformation.
Final design (2006-2007) for the Federal Ministry of Works (F.M.W.) in collaboration with Zephirgold Nigeria Ltd - Nigeria.
Construction of a New Nukkai Bridge along Wukari-Jalingo Road - Route 90 in Taraba State - Nigeria
The reinforced concrete bridge consists of No. 8 spans of 15.00 m each for a total length of 120.00 m and a width of 11.00 m.
Final design and supervision of works (2006-2007) for Contractors Dantata & Sawoe / Federal Ministry of Works (F.M.W.) - Nigeria.
Bridge on the Hadeja river along Jahun-Gujungu Road - Nigeria
The reinforced concrete bridge consists of No. 3 spans for a total length of 46.95 m and a width of 10.40 m.
Preliminary and final design (2003) for the Contractors Borini-Prono & Co. Nigeria Ltd - Ministry of Works and Transports ( M.W.T. ) - Jigawa State - Nigeria.
Bridge on the Karaduwa river along Musawa-Matazu-Karaduwa-Gyaza Road - Nigeria
The reinforced concrete bridge consists of No. 8 spans for a total length of 124.50 m and a width of 10.40 m.
Preliminary and final design (2003) for the Contractors Borini-Prono & Co. Nigeria Ltd - Ministry of Works and Transports ( M.W.T. ) - Katsina State - Nigeria
Ifon Bridge on Osse river along Sabon Gida-Sobe Road - Nigeria
The reinforced concrete bridge consists of No. 5 spans of 20.0 m each in length for a total length of 99.7 m and 11.00 m in width.
Preliminary design (2002) and final design (2006) for the Federal Ministry of Works and Housing (F.M.W.H. ) - Nigeria.
Turame river bridge along Malumfashi-Katsina Road - Nigeria
The bridge consists of No. 3 spans for a total length of 46.14 m and a width of 8.20 m. The deck is made by four steel beams connected to the deck slab.
Preliminary and final design (2002) for the Contractors Borini-Prono & Co. Nigeria Ltd - Ministry of Works Housing and Transports (M.W.H.T.) - Katsina State Government- Nigeria
Bridge along Makurda-Ajiwa-Dam Road - Nigeria
The bridge, in reinforced concrete, is composed by 8 spans for a total length of 125.20 m and a width of 8.20 m.
Preliminary and final design (2002) for the Contractors Borini-Prono & Co. Nigeria Ltd - Ministry of Works and Transports ( M.W.T ) - Katsina State - Nigeria
Bridge on the Nun river along Amassoma-Tombia-Okutukutu Road at Tombia Town - Nigeria
The bridge deck consists in a continuous prestressed concrete box-girder cast in situ, the total length is 557.00 m and the width is 11.00 m.
Supervision of works and design check (2001-2003) for the Federal Ministry of Works and Housing ( F.M.W.H. ) - Nigeria.
Bridge on the Benue river at the Ibi town along the Wukari-Shendam Road - Nigeria
The bridge, with two separate carriageways, is composed by 28 spans for a total length of 2369 m. The width is equal to 11.00 m for each carriageway.
The river Benue discharge is about 18000 m3/sec. In the crossing section, the low water river bed width is 1550 m, and the flooded river bed width is 2500 m, with a maximum water depth of 11 m. Above the maximum water level a freeboard of 12.5 m and a clear way spans of 60 m have been required.
The structure shall be realized with 5 structural elements, connected by sliding prestressed "active joints", that allow the forces transmission; therefore a continuous structure for a total length of 2369 m is achieved.
Each one of the three central elements is composed by 4 spans and by two end half-spans for a total length of 475 m; the two lateral elements are composed by 3 spans of 95 m, by a half-span at bridge side and 3 smaller spans at abutment side, respectively of 77 m, 40 m and 34.5 m, for a total length of 472 m.
Each element is composed by a continuous box-girder beam, in prestressed reinforced concrete, to be built through self-supporting successive cantilever blocks.
The structure is supported by piers fixed with the continuous beam, realized by pairs of flexible septa, in order to absorbe the concrete creep, shrinkage and thermal deformation.
The "active joints" allow to obtain a structural behaviour completely similar to the one of the continuous spans. The "active joints" have been realized interposing, between the cantilever extremities (type Gerber) of the four central joints, two transversal rows of sliding bearings, then tightening the joint with prestressing tendons.
Feasibility study and preliminary design (1998-1999). Draft final design (2000) for the Petroleum (Special) Trust Fund - Nigeria. Final design (2004-2006) for the Federal Ministry of Works (F.M.W.) - Nigeria.